6 minden energy modules 1 phase and 3 phase type em3.
The System
the overhead system will be constructed in 110mm, 76mm and 60.3mm steel pipe using prefabricated steel bends and t pieces ensuring the required vacuum and air flow efficiency.
The pipes will be attached using suitable clamps and ties and will be finished in white.
Centralised Dust Extraction System
The System
the overhead system will be constructed in 110mm, 76mm and 60.3mm steel pipe using prefabricated steel bends and t pieces ensuring the required vacuum and air flow efficiency.
The pipes will be attached using suitable clamps and ties and will be finished in white.
The Plant